Project dossier · Talon Metals Corp. · TLO.TO ↗
Tamarack
Tamarack is a proposed underground mine near Tamarack, Minnesota. The DNR was taking comments on environmental scoping documents at this review; that step is not permission to construct or operate the mine.
This page summarizes issuer and government claims from the linked documents. It is source-checked synthesis, not independent field reporting.
Dossier reviewed Sep 10, 8:05 p.m. EDT. Company identity matches the reviewed listing directory.
Reported facts
| Fact | Reported value | As of | Source |
|---|---|---|---|
| Location | Central Minnesota, approximately 1.5 miles north of Tamarack. | Minnesota Department of Natural Resources · Publication date not stated | |
| Proposer | Talon Nickel (USA) LLC. | Minnesota Department of Natural Resources · Publication date not stated | |
| Reported interest | Talon reported a 51% interest in the Tamarack joint venture with Rio Tinto, with an earn-in right to reach 60%. The additional interest is a right, not reported ownership. | Talon Metals Corp. · Sep 9, 2026 | |
| Environmental review | DNR scoping documents were open for comment. Environmental review informs later permitting; it does not approve construction or operation. | Minnesota Department of Natural Resources · Publication date not stated | |
| Mine and processing locations | The DNR describes a proposed Minnesota underground mine with offsite processing in Mercer County, North Dakota, and Marquette County, Michigan. | Minnesota Department of Natural Resources · Publication date not stated | |
| Proposed surface design | Talon described a 64-acre conceptual surface layout, with enclosed ore handling and no tailings generated or stored in Minnesota. These are proposed design features. | Talon Metals Corp. · Jul 14, 2026 | |
| Vault Zone context | Talon places the Vault Zone below the existing Tamarack Resource Area. The September 9 assay announcement supplies grades for a previously announced drill interval; it is not a new resource estimate. | Talon Metals Corp. · Sep 9, 2026 | |
| Beulah site agreement | Talon announced an option over approximately 256 acres and an associated 7-mile rail spur near Beulah. The agreement is not evidence here that title transferred or a processing plant was built. | Talon Metals Corp. · May 28, 2025 |
Recorded milestones
- Scoping comment period openedcompleted
The DNR released scoping documents for public comment.
July 14, 2026 · status recorded as of Sep 10, 2026 · Minnesota Department of Natural Resources · Publication date not stated Talon Metals Corp. · Jul 14, 2026 - Scoping comments duepending
The DNR states this comment deadline. Consult its page for submission details or changes.
September 14, 2026, 4:30 p.m. · status recorded as of Sep 10, 2026 · Minnesota Department of Natural Resources · Publication date not stated - Final scoping and further environmental reviewpending
The DNR will consider comments before finalizing the EIS scope. Scoping, preparation and adequacy are separate review phases.
No completion date established here · status recorded as of Sep 10, 2026 · Minnesota Department of Natural Resources · Publication date not stated - Future mine permit applicationsproposed
Talon reported contracts supporting future state and federal permit applications. Preparation is not permit issuance.
July 14, 2026 issuer update · status recorded as of Jul 14, 2026 · Talon Metals Corp. · Jul 14, 2026 - Beulah construction targetproposed
This older issuer target followed planned permitting in 2025 and 2026. Completion of those steps and a revised construction schedule are not established by this record.
2027 target announced May 28, 2025 · status recorded as of May 28, 2025 · Talon Metals Corp. · May 28, 2025
Limits
- This is a dated synthesis of public government and issuer documents, not independent field reporting. Later decisions and design changes require a new source review.
- No current mineral resource, mineral reserve, mine economics or funding sufficiency is established by this dossier. Selected assay results do not establish those measures.
- The proposed Tamarack mine, the Vault exploration zone and the Beulah processing proposal are related subjects, not interchangeable project boundaries or operating assets.
Primary sources
- Minnesota Department of Natural Resources: Tamarack Mining Project environmental impact statementPublication date not stated · retrieved Sep 10, 8:05 p.m. EDT · Scoping documents; Public comment period; Project overview; Project location
- Talon Metals Corp.: Tamarack public scoping comment periodPublished Jul 14, 2026 · retrieved Sep 10, 8:05 p.m. EDT · Highlights; Permitting Preparation; About Talon
- Talon Metals Corp.: Tamarack Vault Zone assay resultsPublished Sep 9, 2026 · retrieved Sep 10, 8:05 p.m. EDT · Opening paragraphs and reported intervals; About Talon
- Talon Metals Corp.: Beulah processing-site option agreementPublished May 28, 2025 · retrieved Sep 10, 8:05 p.m. EDT · Highlights; The Beulah Minerals Processing Facility; Agreement Terms